Skip to main content

AssetsTasksParts

General

This part is used to link the parts that are used during the task sign-off. The sheet in the Excel file is called “AssetsTasksParts”.

Details fields

To fill the Excel file correctly, ensure that all fields are completed accurately. Below are the fields listed.

Field MAX Characters  Required Comment
ParentCategories
X Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, >, and a space, followed by the ID + name of the subcategory
AssetsTasksGroupName 128 X Name of the group to which the maintenance task is connected. 
TaskName 128 X The name of the maintenance task
Owncode 50 X The unique number of the part that will be linked to the task
Quantity
X The quantity of the part that will be used during the task sign-off
CostCode 50
Lookup to the Cost Codes as defined in the tab Administration. This should exactly match the name of the cost code.