AssetsTasksRanks
General
This part is used to link ranks to a task. The sheet in the Excel file is called “AssetsTasksRanks”.
Details fields
To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.
Field | MAX Characters | Required | Comment |
ParentCategories | X | Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory | |
AssetsTasksGroupName | 128 | X | Name of the group to which the maintenance task is connected. |
TaskName | 128 | X | The name of the maintenance task |
RankName | X | The name of the rank that must be linked to the task |
If more ranks must be linked to one task, add per rank a new line to be linked to the task.