AssetsTasksHistory
General
This part is used to load the history of assets tasks in MXSuite. The sheet in the Excel file is called “AssetsTasksHistory”.
Details fields
To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.
| Field | MAX Characters | Required | Comment |
| ParentCategories | 128 | X | Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory |
| GroupName | X | Name of the group which the maintenance task is connected | |
| Description | X | A description of the task to be carried out | |
| DatePerformed | X | Date the task was performed. This is in DateTime format | |
| SignOffUser | X | Name of the person who carried out the task | |
| SignOffDate | X | Date the task is due in MXSuite | |
| CounterValue | If the task is a counter based task, enter here the counter value when the task was done | ||
| IsMistake |
If an error is identified after a task has been signed off and the task is subsequently reopened to allow the correction to be made, this value is set to True. Otherwise, the value is False
|