Skip to main content

AssetsTasksGroups

General

All maintenance tasks are linked to a maintenance job plan. The job plan is linked to a category. So the maintenance job plans are between the categories and maintenance tasks.

The sheet in the Excel file is called “AssetsTasksGroups”.

Details fields

To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.

FieldMAX Characters RequiredComment
ParentCategories
XShow the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory
Name128XName of the group
ID128
ID number of the group
CostCode

The Costcode name should exactly match the name of the Budgetcode as known in Administration -> Budgetcodes