Asset tasks groups
All tasks are linked to a maintenance job plan. The job plan is linked to a category. So the maintenance job plans are between the categories and maintenance tasks.
The sheet in the Excel file is called MaintenanceJobPlanList.
To fill the Excel file correctly, take care that all fields are properly filled. Below are the fields listed.
Field |
MAX Characters |
Required |
Comment |
ParentCategories |
|
X |
If this category is a child of another category, enter the ID number of the parent category, followed by a space, followed by the name of the parent category |
Name |
128 |
X |
Name of the Job Plan |
ID |
128 |
|
ID number of the job plan |
CostCode |
|
|
Lookup to the Cost Codes as defined in the tab Administration. This should exactly match the name of the cost code. |