Skip to main content

AssetsTasksRanks

General

This part is used to link ranks to a task. The sheet in the Excel file is called “AssetsTasksRanks”.

Details fields

To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.

FieldMAX Characters RequiredComment
ParentCategories
XShow the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory
AssetsTasksGroupName128XName of the group to which the maintenance task is connected. 
TaskName128XThe name of the maintenance task
RankName
XThe name of the rank that must be linked to the task

If more ranks must be linked to one task, add per rank a new line to be linked to the task.