AssetsTasksRanks General This part is used to link ranks to a task. The sheet in the Excel file is called “AssetsTasksRanks”. Details fields To fill the Excel file correctly, ensure that all fields are completed accurately. Below are the fields listed. Field MAX Characters  Required Comment ParentCategories X Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory AssetsTasksGroupName 128 X Name of the group to which the maintenance task is connected.  TaskName 128 X The name of the maintenance task RankName X The name of the rank that must be linked to the task If more ranks must be linked to one task, add per rank a new line to be linked to the task.