# AssetsTasksProjectTypes

#### General

This part is used to load all project tasks in MXSuite. The sheet in the Excel file is called “AssetsTasksProjectTypes”.

#### <span lang="en-gb">Details fields</span>

<span lang="en-gb">To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.</span>

<table id="bkmrk-field-max-characters" style="border-collapse: collapse; width: 99.881%; height: 2029px;"><colgroup><col style="width: 25.5066%;"></col><col style="width: 10.7271%;"></col><col style="width: 10.0119%;"></col><col style="width: 53.7545%;"></col></colgroup><thead><tr style="background-color: rgb(230,126,35); height: 46.5938px;"><td style="height: 46.5938px;">Field</td><td style="height: 46.5938px;">MAX Characters</td><td style="height: 46.5938px;"> Required</td><td style="height: 46.5938px;">Comment</td></tr></thead><tbody><tr style="height: 80.1875px;"><td style="height: 80.1875px;">ParentCategories</td><td style="height: 80.1875px;">  
</td><td style="height: 80.1875px;">X</td><td style="height: 80.1875px;">Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, &gt; , and a space, followed by the ID + name of the subcategory</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">AssetsTasksGroupName</td><td style="height: 29.7969px;">128</td><td style="height: 29.7969px;">X</td><td style="height: 29.7969px;">Name of the group which the maintenance task is connected. </td></tr><tr style="height: 30.5938px;"><td style="height: 30.5938px;">TaskName</td><td style="height: 30.5938px;">128</td><td style="height: 30.5938px;">X</td><td style="height: 30.5938px;">The name <span lang="en-gb" style="font-size: 11pt; font-family: Calibri, sans-serif;">of the maintenance task</span></td></tr><tr><td>ProjectTypeName</td><td>128</td><td>X</td><td>The name of the project</td></tr></tbody></table>