Skip to main content

AssetsTasksParts

General

This part is used to link the parts that are used during the task sign-off. The sheet in the Excel file is called “AssetsTasksParts”.

Details fields

To fill the Excel file correctly, ensure that all fields are completed accurately. Below are the fields listed.

FieldMAX Characters RequiredComment
ParentCategories
XShow the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, >, and a space, followed by the ID + name of the subcategory
AssetsTasksGroupName128XName of the group to which the maintenance task is connected. 
TaskName128XThe name of the maintenance task
Owncode50XThe unique number of the part that will be linked to the task
Quantity
XThe quantity of the part that will be used during the task sign-off
CostCode50
Lookup to the Cost Codes as defined in the tab Administration. This should exactly match the name of the cost code.