# AssetsTasksGroups #### General All maintenance tasks are linked to a maintenance job plan. The job plan is linked to a category. So the maintenance job plans are between the categories and maintenance tasks. The sheet in the Excel file is called “AssetsTasksGroups”. #### Details fields To fill the Excel file correctly, make sure that all fields are filled correctly. Below are the fields listed.
**Field** | **MAX Characters** | **Required** | **Comment** |
ParentCategories | X | Show the category path of the category that this entity needs to be connected to. If this is linked to a subcategory, enter the ID + name of the main category, followed by a space, > , and a space, followed by the ID + name of the subcategory | |
Name | 128 | X | Name of the group |
ID | 128 | ID number of the group | |
CostCode | The Costcode name should exactly match the name of the Budgetcode as known in Administration -> Budgetcodes |