# Asset tasks groups All tasks are linked to a maintenance job plan. The job plan is linked to a category. So the maintenance job plans are between the categories and maintenance tasks. The sheet in the Excel file is called **MaintenanceJobPlanList**. To fill the Excel file correctly, take care that all fields are properly filled. Below are the fields listed.
**Field** | **MAX Characters** | **Required** | **Comment** |
**ParentCategories** | X | If this category is a child of another category, enter the ID number of the parent category, followed by a space, followed by the name of the parent category | |
**Name** | 128 | X | Name of the Job Plan |
**ID** | 128 | ID number of the job plan | |
**CostCode** | Lookup to the Cost Codes as defined in the tab Administration. This should exactly match the name of the cost code. |